Healthcare Validation Services

Endoscope Re-processors (AERS)

To comply with UK and European protocols, autoclaves, sterilisers, washer disinfector and other decontamination equipment all require periodic maintenance, calibration and validation to ensure the equipment is operating safely and accurately.

The PPM planned preventative maintenance service carried out by, Healthcare Validation services ltd has been developed to maintain the reliability of your washer disinfector and minimise any down time. Depending on the usage of the units we typically recommend these are usually carried out quarterly or bi-annually,

We comply with the latest HTM01.01, BS2646, European standards EN285 and EN15883.

Endoscope Re-processors (AERS) Maintenance and Validation Services
  • HTM01.06 Testing
  • Planned Preventative Maintenance Contracts
  • Water Analysis
  • Performance Qualification (PQ)
  • Microbiological Testing
  • Weekly TVC Testing
  • Weekly Testing
  • Quarterly Testing
  • Annual Testing